Project Examples
Completed Projects
From our project and concept work (anonymized)
Conception & Strategy
Innovative approaches for a new automotive plant, North America
Vehicle manufacturer · 2022
For a newly planned plant, we examined where automated guided vehicles can replace conventional conveyor technology – from the body shop through the paint shop and assembly to logistics.
- Body shop as a flexible matrix instead of a rigid line
- Paint processes with variable sequences
- Car body buffer without conveyor technology – all on one level, with free sequencing
- Plant-wide transport management system with open communication standards, a private 5G network and AI-supported fleet optimization
Planning & System Design
Unmanned intralogistics for a beverage producer
Southern Germany · 2023
Outline concept for automating all pallet transports in an expanded logistics center – as the basis for a cost-benefit analysis and tender.
- Two forklift AGV types for triple pallet packs and single pallets on approx. 15,000 m² of traffic area
- FIFO-managed block storage for full and empty goods
- Synchronized order picking and shipping provision with up to 200 pallets per hour
- Step-by-step introduction with quality gates, including a cost estimate
Planning & System Design
Overall intralogistics concept for a manufacturing company
2024
End-to-end automation concept from goods receipt to the production machines – with harmonized volume data, vehicle selection and a roll-out scenario.
- Approx. 1,400 transports per day with 13 vehicles of five vehicle types
- Unmanned film supply right into the packaging machine through AGV–cobot interaction
- Inventory-managed block storage with maximum storage density
- Implementation with two project teams: agile for transports, classic for process automation
Tender & Award
Complex AGV system in three interconnected buildings
Ongoing project
We are preparing the tender documents for a complex automated guided vehicle system connecting three interconnected buildings.
Commissioning
AGV system in a central bank, Western Asia
Implementation support
The project was already several months behind schedule. With our support, the automated guided vehicle system was commissioned and the final milestone was reached.